info@wingoil.com         +86-23-63089919         Send A Message

A, use

by:Wingoil     2020-04-02
Applicable to the valves, pipe fittings, piping, fittings, pressure vessels, automobile brake hose to pipe, oil pipe, air conditioning and hydraulic equipment, engineering machinery, mining machinery hydraulic hose all kinds of metal, non-metallic pipe, joints and accessories such as compression device of high pressure and ultra-high pressure testing, inspection, also suitable for scientific research, the inspection department for testing tools. Second, the model significance WBS - G80 MBS - - - - - - - - - - - - - Code G80 - liquid pressurization device - - - - - - - - - - - - Pressure ratio: 80:1 three, working principle of the four products, technical parameters of system pressure rated 48 40 mpa air pressure is driven 0 mpa pressure of work. 6 - 0. 8 mpa water 10 l stainless steel water tank the zero state flow. 5 l/MIN high pressure outlet thread ZG1/4 internal thread ( Optional) Noise < 75 db high pressure thread type ZG1/4 high export number four five, equipment appearance reference: six, main configuration: serial number that number 1 type/model/manufacturer. High pressure pneumatic booster pump 1 Shineeast brand G80 gas-liquid booster pump 2. 1 UFR04 3 pressure regulating valve. Oil mist detector 1 UFRL04 4. High pressure needle valve 1 Seth SCV70 5. Unloading of the needle valve 1 Seth SCV70 6. To drive the gas switch 1 SST - Seth 1 to 7. Water tank and accessories 1 Seth is 8. The barometer of jiaxing KEMEI (1 0 - 1MPa) 9. High pressure gauge jiaxing KEMEI (1 0 - 60MPa) 10. Stainless steel frame type enclosure 1 MBS 11. Piping, joints, valves and assembly 1 Seth, seven, the introduction of step 1. Tank filled with water, add two couplet of oil mist detector to clean lubricating oil. South with # 10 or 20 # machine oil, north winter with antifreeze machine oil or low condensate hydraulic oil. Every time the amount of oil cup two-thirds of volume. Workshop of compressed air to the driver gas entrance ( 0. 5 - 0. 8mpa) , connect high pressure hose to be tested, Containers have to be filled with water in advance, discharge the air inside container) 。 2. To adjust the Pressure regulating valve 】 Air pressure is adjusted, Theory of supercharging for 80:1, 40 mpa is adjusting to 0 if necessary. 5 - 0. 55 mpa drive source, personnel supervision is required when test, in order to prevent the damage of high pressure tested) Adjusting the air pressure don't too low, the low pressure booster pump can't start the 3. Open the [ Drive switch 】 【 High voltage switch 】 , close the 【 Unloading switch 】 4, start the experiment. Booster to the required pressure closed after 【 High voltage switch 】 , pressure test after the holding time, see if qualified, open the Unloading switch 】 Removing the system pressure 5. Disconnect the fitting, the end of the test.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...